LOS Survey

Line-of-sight verification between tower sites for microwave backhaul planning.

A microwave hop needs a clear line of sight. We verify LOS between candidate towers using physical survey, GPS coordinates and path-profile analysis, identifying obstructions, Fresnel-zone intrusion and required antenna heights before a single rupee is spent on equipment.

What this includes

  • Physical and theoretical line-of-sight verification
  • Path profiling and Fresnel-zone clearance checks
  • Obstruction identification and mitigation advice
  • GPS coordinates and required antenna heights
  • Hop feasibility confirmation before rollout
  • Photo-documented LOS survey report